Z-Climb™ ACF5080Self-Climbing System Formwork

ZOLO Z-CLIMB™ ACF50/80 is one type of quick circle time and crane-independent climbing formwork.

ZOLO Z-CLIMB™ ACF50/80 power source is its own hydraulic system, the hydraulic system consists of hydraulic station, hydraulic cylinder and oil pipe, etc. Through the hydraulic system, it can make Z-CLIMB™ ACF50/80 formwork frame body and the guide rail to mutual climbing, so as to make the formwork system climb upward steadily.

Overview

ZOLO Z-CLIMB™ ACF50/80 is one type of quick circle time and crane-independent climbing formwork.

ZOLO Z-CLIMB™ ACF50/80 power source is its own hydraulic system, the hydraulic system consists of hydraulic station, hydraulic cylinder and oil pipe, etc. Through the hydraulic system, it can make Z-CLIMB™ ACF50/80 formwork frame body and the guide rail to mutual climbing, so as to make the formwork system climb upward steadily.

In the construction process, Z-CLIMB™ ACF50/80 climbing formwork works without other lifting equipment, it is easy to be operated with rapid climbing speed and high safety factor.

ZOLO Z-CLIMB™ ACF50/80 both can climb straight and diagonally, It is the first choice of high-rise building core wall and bridge pylon.

Z-Climb™ ACF5080Self-Climbing System Formwork

Features

1、Z-CLIMB™ ACF50/80 Self-Climbing Formwork System no need for tower crane repeatedly installed and dismantled, saving manpower, low labor intensity, high degree of mechanization.

2、High safety with multi-floor of operating platform..

3、The formwork panel and the climbing bracket work at the same time, the construction speed is fast to save the cost during the working period.

4、Z-CLIMB™ ACF50/80 Self-Climbing Formwork System components has very high versatility with Zolo other climbing formwork system to help the clients saving more materials investments.

5、Z-CLIMB™ ACF50/80 Self-Climbing Formwork System demolding operation adopts adjusting bracket and horizontal setback device, which is easy to operate and ensures smooth demolding work. Z-CLIMB™ ACF50/80 Self-Climbing Formwork System panel face can be cleaned up in situ, which can save the formwork stacking site and storage cost

6、According to the premise of checking and calculating, it is possible to realize hanging ladder on the main bracket and docking with the construction elevator; carrying the concete placing boom and climbing at the same time.

Specifications
MaterialQ355 High Strengthen Structure Steel+Powder Coatiing or Galvanized
Single Bracket Body Weight1500KGS
Width of Main Platform3000mm
Hydralic Station Flow60L/Min.
Hydraulic Jack Stroke/Working Pressure300mm/ 25Mpa
Rated Lifting Capacity50KN Min./100KN Max.
Climbing Speed0.1meters/Minutes
Pouring Height≤4.5Meters

Besoin d'un devis ? Le chef de produit Zolo vous invite toujours à rappeler.

+86 311 8783 3311
+86 199 4348 2237
Écrivez-nous

Que vous souhaitiez obtenir plus d'informations sur quoi, pourquoi et comment nous faisons ce que nous faisons, avez besoin d'aide pour quoi vous créez, souhaitez vous associer ou simplement nous dire bonjour ! --- nous serions ravis d'avoir de vos nouvelles.

*
*
*